Implementation of the main sewage collection lines in Kashan
Construction of a 24 km long sewage transmission line using tunnel and open trench methods with double-walled polyethylene pipes (carogate) with diameters of 500, 600, 800 and 1200 at depths of 5 to 13 meters.